Nikitin Sole Proprietor

Case Studies

Completed projects โ€” from analysis to launch

Security systems salesJanuary 2025 - December 20251C 8.3

Sales System Migration for a Security Systems Market Leader

Client: A market leader in integrated security systems

Challenge

The client needed to migrate its sales business processes from the legacy Trade Management 10 (UT 10) platform to the new Complex Automation 2 (KA 2) system. A large-scale project involving multiple project teams.

Solution

Analyzed the sales process in the legacy system. Configured and launched the sales process in the new system. Built a sales workstation (ARM) from scratch. Produced video instructions and automated scenario tests (Vanessa Automation). Fine-tuned access rights and roles.

Result

Complete migration to KA 2, a fully functional sales workstation, trained staff, automated testing in place

Stack: KA 2, Vanessa Automation
Catering / food productionOctober 2025 - January 20261C 8.3

Mandatory Labeling for Dairy Products and Pharmaceuticals

Client: A large catering factory-kitchen

Challenge

Needed to set up mandatory product labeling for dairy products, pharmaceuticals, dietary supplements, and ready-made meals, across several legal entities and multiple 1C databases.

Solution

Configured EDI electronic document exchange. Set up Chestny Znak (Russia's mandatory product-labeling system) for dairy products, pharmaceuticals, and dietary supplements. Integrated 1C with an external recipe-management system.

Result

Fully functional labeling across all product groups, integration with Chestny Znak, EDI exchange configured and running

Stack: 1C:Accounting (BP) 3.0, Retail 2.3
Equipment manufacturing and salesJune 2024 - May 20251C 8.3

CRM Implementation and Multi-System Migration

Client: A supplier of industrial refrigeration equipment

Challenge

The client needed to consolidate processes from several systems (Trade Management 10 and Fabrika 24) into a single KA 2 instance, covering CRM, sales, rental, and repair workflows.

Solution

Analyzed the sales process in the legacy system. Launched the sales process in KA 2. Enhanced the stock reservation system. Configured and integrated the 1C:CRM module.

Result

A single KA 2 system replacing three disconnected ones, a fully functional CRM module, and reservation working end-to-end across the entire sales chain

Stack: KA 2.5, 1C:CRM
DistributionApril 2025 - August 20251C 8.3

Automation for a Major Distributor

Client: A leading food products distributor

Challenge

Needed to launch the company's core business processes in 1C, including migrating data from a legacy version of 1C:Salary and HR Management (ZUP) to ZUP KORP 3.1.

Solution

Conducted business analysis together with top management. Delivered product demos and pre-sale consulting on 1C solutions. Converted data from the legacy ZUP to ZUP KORP 3.1. Developed user instructions.

Result

KA 2.0 and ZUP KORP 3.1 launched, data migrated, users trained

Stack: KA 2.0, ZUP KORP 3.1
Food productionDecember 2025 - February 20261C 8.3

Real-Time Production Control System

Client: A manufacturer of sausage and smoked meat products

Challenge

No visibility into production stages, from order intake through to finished-goods release.

Solution

Built a real-time production tracking tool covering the full cycle: order intake -> production -> finished-goods release.

Result

Transparent production control, reduced losses, and real-time order management

Stack: Custom-built configuration
CallTelegram